Will AI compute stay tight?
Tight now: rents are rising, and labs pay a premium for short-term capacity. It stays tight only if token demand outgrows a build-out that more than doubles by 2028.
Will it stay tight?
Shortage or oversupply? Inference growth vs the build-out
How demand is calculated
More assumptions, method and limits
Read it as: a small inference share is not idle compute. Rental indices are up over 90 days (SemiAnalysis H100 and B200, early November 2026; mixed over 30 days) and labs buy short-term compute at a premium, so the rest is in use: training (labs choose its size, it does not scale with tokens), traffic we cannot count (the revenue check says our tokens run ≈1.6–2× low), recommender and ads workloads in Meta’s and Google’s fleets, and chips delivered but not yet powered. When inference passes labs’ serving share, inference and training compete for the same compute.
Software efficiency check: if Anthropic’s list prices for its main models stayed flat through 2026, a constant realized price is fair and the cost-of-revenue check is weak evidence for 1×, not none. We have not yet checked the 2026 price history.
Method: inference demand = ex-China logical tokens/day, grown monthly from the projection date. It is priced, not benchmarked: GPUs needed = tokens × serving cost per token ÷ price per GPU-hour. Serving cost per token comes from Anthropic’s filing: cost of revenue $4.812B in January–September 2026 (“substantially all” customer-serving compute) ÷ its ≈123T/day of consumption-billed tokens over those months = ≈$0.143 per million tokens. This bundles utilization, model size, chip mix and overheads as they actually occurred at one large lab. It overstates cost per token because subscription traffic is not in the token count, and Anthropic’s models are likely heavier than average; cheaper-to-serve traffic elsewhere would need fewer GPUs. The note under the chart shows how many times the GPUs the DeepSeek-V4-Pro benchmark would need this implies.
Chips and power
Five hyperscalers own most AI chips. Google, Microsoft, AWS, Meta and Oracle held about 14M H100-equivalents at end-2025, Epoch AI estimates. Tracked data-center power more than doubles by 2028.
Who owns the chips, and how much power comes online when
Estimates from Epoch AI and company filings.
How to read this chart
Tracked data-center power, year by year
Facility power at the frontier campuses Epoch AI tracks: a floor, not every data center.
How to read this chart
Inference and token use
We estimate about 1.7 quadrillion tokens a day worldwide, growing about 15% a month. Labs spend most of their compute on training; serving takes a quarter to a third.
Tokens per day today, by company
latest disclosed · projected on its own trend to today · line = range. Hover a name for its scope. Router and marketplace traffic is left out (double counting).
Components, trends, spend and sources
Training vs inference: where lab compute goes
How to read this chart
Anthropic’s filing puts customer serving at ≈26% of compute spend (up to ≈36% counting free-tier use, E). Hosts and chip sellers report inference above 50% of their own revenue or usage, which is a different measure (table below). Light segment = stated range. RL rollouts count as training but run like inference. Grades: R = reported (filed or attributed press), D = derived by this site from a filing or prospectus, E = estimate; R/E = reported low end with an estimated high end. Forecasts are left out. Hover a bar for basis and source.
Host and chip-seller statements (revenue or usage, not a lab’s split)
What could change the answer
Can labs keep paying for training?
Training ÷ revenue
Band: Anthropic on trend (64–74% of compute is training). Hollow: its signed commitments. Filled: OpenAI’s reported projections. The sliders move only Anthropic’s band and markers; OpenAI’s points stay fixed.
Funding gap vs what the two could raise
Sources, signals and method
Do the Nov 2026 midterms slow the build-out?
Method, assumptions and sources
What if the neolabs fail?
Who is exposed
Who gets hurt first if demand falters: neoclouds and their landlords
How each factor is scored
What do stock prices assume?
How the return and cost of capital are calculated
Margin rule, limits and sources
Research, not investment advice.
Compute deals
A few AI labs sign most of the money. Anthropic and OpenAI are the largest buyers. Neoclouds resell to them, and landlords build the halls.
How the companies connect
Buyers rent compute from clouds; clouds lease powered buildings from landlords. Width is disclosed dollars on the left, contracted MW on the right.
Swipe across the diagram to follow buyers → clouds → landlords, or choose a company above.
How to read this chart
Built from the same contract rows as Table 2 (non-excluded, announced from the selected year). The six largest buyers are named; everyone else is one grey “Other buyers” row and undisclosed counterparties one “Undisclosed buyers” row; beyond the 14 largest clouds and 10 largest landlords the rest are grouped. A company that both buys and sells (Oracle, CoreWeave) is drawn once per side it acts on; its other role is named in the hover. Buyer → cloud width is disclosed nominal value; cloud → landlord width is contracted MW; each side has its own scale. Dashed links have no disclosed size. A row that its source marks as the same underlying deal as another (OpenAI–Oracle, 4.5 GW, 2025-07-22 and 2025-09-10) is counted once in MW. “Disclosed landlords” are the listed hosts and builders in the deal data (miners, Crusoe and others); hyperscalers’ own campuses and wholesale developers such as QTS, Vantage and Stack are not in the deal data, so this column is not the whole landlord side. Add chip-supply orders to include NVIDIA, AMD and other hardware deals. Framework plans such as Stargate’s $500B are excluded: they commit no one to a price. Building leases are kept apart from compute services, so the same capacity is not counted twice. “Firm” means a stated amount that is not “up to”, conditional, cancellable or potential. A connected path does not allocate particular racks or megawatts through a reseller. Amounts retain their conditions and can overlap.
Largest deals in the current view
How implied prices are worked out
No contract here gives a GPU count, so every $/GPU-hour is an estimate from the all-in $/kW-month, which stays comparable across chip generations: $/kW-month × kW per GPU ÷ 730 hours. It is shown only for NVIDIA and AMD GPU deals, not Trainium, TPU or Cerebras capacity. Fig. 8 labels use 2.12 kW per GB300-class GPU; the hover range uses 2.0–2.6 kW, pre-Rubin power draw, which is a floor for 2027 and later deliveries. Leases of powered buildings are priced per kW-month and include no chips.
Compute prices
Rental prices for H100 and B200 GPUs come from daily market benchmarks.
Market price movements
Rental price indices over time
Neither index is a one-year contract price.
What the big deals cost per kilowatt, per month
Red: compute, chips included. Green: a powered building only. The gap between the medians is roughly the chips and servers. ≥ marks a floor.
How to read this chart
$/kW-month = deal value ÷ (megawatts × 1,000) ÷ months of the term. For red bars on NVIDIA or AMD GPUs, the ≈ $/GPU-hour label is an estimate (E) at 2.12 kW per GB300-class GPU and 730 hours a month; Trainium and Cerebras deals get no GPU-hour figure. ≥ marks a floor: a minimum value or a maximum capacity. Samples differ in geography, power basis, delivery date and contract terms.
Compute in China
Chinese clouds disclose spending and revenue but almost never fleet sizes. Epoch AI tracks China as one bucket, so Fig. 9 shows chips, not companies. China’s ~500T/day of reported tokens are mostly text and agent traffic; video is an estimated 1.6%, range 0.3–8% (method).
Accelerators delivered to China, end-2025
Table 3 · What the Chinese clouds disclose
More data
Detail behind the answer: chip models, supplier growth, per-chip rate cards, each company’s reported tokens and the capacity calculator. Each opens in place.
A1 Which chips are in the fleets
Which chips are in the fleets
Estimated delivered chips, stacked by owner. These are physical chip counts, not equal units of performance. Renting capacity does not transfer chip ownership.
Individual disclosures and source records
The table also includes reported deliveries, customer-use subsets and planned deployments. These records can overlap the chart and one another. H100/H200 is one combined source category; it is not split into invented counts.
A2 Supplier growth: revenue, power and backlog
Revenue, power and backlog over time
The big clouds keep growing every quarter, and the neoclouds grow faster from a smaller base. Pick companies and a metric; Indexed shows growth since Q2 2025 on one scale.
Dates, values and reporting scope
A3 Published rental rates by chip
Published rental rates by chip
Not throughput-normalised: a chip-hour price does not compare model throughput. One dot per provider: its lowest published region/configuration quote for the selected terms. “From” rates stay separate. The table retains every region, configuration, billing formula and source.
Rate cards, original billing units and conversions
A4 Tokens served, as each company reports them
Tokens served, as each company reports them
Daily equivalents grouped by reporting scope and period, with native disclosures retained below.
Latest verified disclosure per scope, not today’s volume. Gold bars (D) are period conversions; obs = observed date, pub = publication date. Scopes overlap.
Conversion rules
Month-only rates use a stated 30-day convention; exact observed windows use their day count. API, company, rollout and single-cluster coverage remain distinct. Bounds and ranges survive conversion. Router, provider and national totals overlap.
All disclosures, with dates, scope and sources
Why Google’s daily and monthly figures differ
Google’s May 2026 figure of over 3.2 quadrillion tokens/month covers its surfaces broadly (over 106.7T/day using a 30-day month). The October disclosure of nearly 32B/minute covers first-party model APIs (nearly 46.08T/day as a rate equivalent). The old 3T/day series covers internal developer tools. These are overlapping scopes from different dates; none should be substituted for another. May disclosure · October disclosure · Internal-tools disclosure.
Coverage and undisclosed totals
A5 Capacity calculator: racks and MW on open models
How many racks this traffic would need on open models
If today’s estimated traffic ran on one open model: racks and facility MW at its best measured GB300 NVL72 throughput.
How to read this chart
Each bar assumes today’s estimated traffic ran on one open model, at that model’s best measured throughput on GB300 NVL72 racks (above 50 tokens/s per user). A configuration comparison, not an equal-quality ranking. MW is facility power at the all-in kW per GPU set below (default 2.12 kW, SemiAnalysis’s GB300-class figure).
Enter a positive traffic volume and nonnegative finite cost and power assumptions.
Per-model operating point, racks and GPUs
Tokens are not all the same work
Cache hits change the token mix above, not the rack estimate: the benchmarks do not isolate uncached prefill, so racks keep each run’s own cache behavior.
Assumptions, packing and source checks
GLM-5.3 has no NVL72 run, so GLM-5.2 is shown. Physical GPUs per group are checked against each run’s job topology. Usable capacity reserves headroom for downtime and peaks (not a measured utilization). Speeds are 1 ÷ P90 inter-token latency.
Defaults: SemiAnalysis’s GB300 NVL72 page, retrieved November 3, 2026: $2.31 per chip-hour owning at large hyperscaler volume, 2.12 kW all-in power per chip (host, networking and cooling share). Annual cost = all physical GPUs × hourly cost × 8,760. Neither figure is a purchase quote.
Method: group equivalents = max(input tokens/day ÷ 86,400 ÷ group input TPS, output tokens/day ÷ 86,400 ÷ group output TPS) ÷ usable capacity. Round up to groups, then to whole racks. This is a fixed-rate extrapolation from coding-trace replay. A different input/output mix, context length, cache distribution or serving stack can change the attainable rates. Full-rack packing was not measured.
Benchmark scope: AgentX variable-length coding traces, prefix caching and speculative decoding. Runs use different engines, parallel layouts and cache setups; this is a configuration comparison, not a controlled model-only comparison. Input throughput counts reused context as well as fresh input.
Why not use the headline? The run pages’ 100-token/s figures interpolate total logical throughput. They are not output throughput. Pro’s overview also applies a decode-share factor after the raw producer has already divided by all allocated GPUs. This calculator uses the raw absolute input and output rates and explicit physical groups instead. Producer · Overview transformation.
Source metadata: API precision labels are reported as given and do not establish uniform arithmetic precision. The selected runs, full raw rows, job topologies and response hashes are in the expanded snapshot; the earlier GB200 selections remain in the original snapshot.
The historical Fireworks Pro 0813 serverless tariff is not used as current revenue: Fireworks says that endpoint was retired from serverless. Current GPU ownership cost and hypothetical API billing are different quantities.
Company profiles
One card per company with its fleet, power, contracts and prices. Empty means not disclosed, not zero.